Skip to content
EasysailENERGY
← All energy directionsDIRECTION 02 / SOLAR POWER

Solar power for your site.

Explore PV generation as its own project or as part of a hybrid power system. Modules, mounting, inverter and connection method are chosen around available area, grid conditions and the load.

Discuss solar power
Rooftop solar PV with inverter and battery cabinet
FROM THE PROJECT BRIEF

Specify the PV system around the site.

Single-phase or three-phase layouts and DC-coupled or AC-coupled approaches are considered according to the existing electrical equipment, operating mode and project design.

01

PV modules & mounting

Roof or ground area, orientation, structure and climate establish the usable array.

02

Inverter & connection

Grid-tied, off-grid or hybrid operation determines inverter and control requirements.

03

Storage coordination

Battery and energy-management scope follows the load profile and desired operating hours.

Combine solar with wind and storage when the project calls for it.

Solar PV can be planned independently. For a hybrid project, compare the wind range and battery requirements against the site load.

Wind power ↗Wind · Solar · Storage ↗

Planning a wind, solar or storage project?